BM Bathroom

Project Name
BM Bathroom
Project Summary
Refinish existing cabinetry. Install new countertop, flooring and shower door.
Project Story
When this client came to us, the first-floor bathroom didn't have the toilet installed and the flooring had to be partially taken up due to a repair they were having done. The bathroom had some nice tiling all through the shower and the back of the vanity. Since these areas were not directly affected by the other work that needed to be done, we kept those areas intact, while giving the space a revitalized look. We were able to accomplish this by painting the existing vanity. Replacing the countertop with a light-colored quartz material. Installing a brand-new glass shower enclosure and new lavatory faucet. This bathroom had wallpaper that the homeowner wanted to be removed, and after this was done, we painted the walls, installed a new mirror and new vanity sconces. We love seeing how projects come together and how much joy it brings to the homeowners.
Project Category
Bathroom Remodeling
Job Category
Standard Bath
Services Performed
Uncategorized
Products Used
Daltile, Arizona Frameless Shower Enclosure. Mapei Grout. MSI. Moen.
City
Williamsburg, VA
State
Virginia
Who did the work
Dream Maker Bath & Kitchen
Williamsburg - IMG_6261.jpg
After
Bathroom
Williamsburg - IMG_6263.jpg
After
Bathroom
Williamsburg - IMG_6265.jpg
After
Bathroom
Share this project:

Design Your Space With the Help of Our Experts.

"*" indicates required fields

Services
This field is for validation purposes and should be left unchanged.